Farmhouse Kitchen CUPC Stainless Steel 304 Double Bowl sink

FOB Reference Price:Get Latest Price
US $20-60 / Pieces | 50 Piece/Pieces (Min. Order)
Color:
silver
Material:
Stainless Steel
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
OEM
Model Number:
10050D-1
Feature:
Without Faucet
Surface Treatment:
Polished, Polished, electroplate,decorate
Installation Type:
Above Counter
Bowl Shape:
Rectangular
Number of Holes:
Two
Sink Style:
Double Bowl
Material:
Stainless steel 304-18/8
Depth(mm):
180(B), 130(S)
Thickness(mm):
0.8
Dim(mm):
1000X500
Bowl size:
400x340, 300X180
Style:
Contemporary
Specific Use:
Kitchen
Delivery Time:
30 days
Supply Ability
Supply Ability:
100000 Piece/Pieces per Month kitchens sinks
Packaging & Delivery
Packaging Details
Foam, carton, pallet.
OEM is available
Farmhouse Kitchen CUPC Stainless Steel 304 Double Bowl sink
Port
shenzhen/shunde
Product Description

       

 

 

Model Name

10050D

Material

Stainless steel  304-18/8

Packing Way

Foam, carton, pallet

MOQ

50 pcs

Port of loading

Shenzhen/shunde

Payment tern

T/T, against copy BL. To the other payment term, pls contact us.

Delivery Time

30 days

Specific Use

Kitchen

Strength

1. Reasonable price

2. SUS 304 stainless steel material guarantee the water quality.

3. Strong performance of anti bacterium

4. Various styles can customized as customers’ request

Contact US
Hot Sale
Certifications

 

Company Information

 

Product Process

 

FAQ

FAQ:

 

1. Q: Are you a factory or trading company? 

A: We are a factory. We produce Sinks and Faucets.

2. Q: Where is your factory located? How can I visit there? 

A: Our factory is located in No.1 Technologic Area Road 3, XingTan Industrial Estate, Xingtan, Shunde District, Foshan City, Guangdong province, China. All our clients, from home or abroad, are warmly welcome to visit us!

3. Q: What is the material of your products?
A: The material is SUS 304 stainless steel
.

4. Q: How can I get some samples?

A: We can accept small order at the first cooperation and make production after you paying for us. Delivery time is 30 days, 30% deposit shuould be paid before shipment, 70% balance should be pay before shipment. You just tell me the port name and our forwarder will ship the goods to your port.   

5. Q: How does your factory do regarding quality control?

A:  "Quality is priority.''Our inspector QC will check the goods in every procedure and modify the parts once they find any problems from them. For our salesman will also check our goods and take photos for every procedure for our client to confirm.

Packaging & Shipping