RR2920A Wholesale bathroom sink stoppers, corvette sink

FOB Reference Price:Get Latest Price
US $30-60 / Pieces | 50 Piece/Pieces (Min. Order)
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
OEM
Model Number:
RR2920A
Material:
Stainless Steel, Stainless steel 304-18/8
Feature:
Without Faucet
Surface Treatment:
Brushed, Brushed
Installation Type:
Undermount
Bowl Shape:
Rectangular
Number of Holes:
Two
Sink Style:
Double Bowl
Product name:
RR2920A Wholesale stainless steel square undermount sink
Depth(Inch):
10"
Thickness(Guage):
18
Dim(Inch):
29"x20"
Bowl Size(Inch):
12-7/8"x18"
Style:
Contemporary
Specific Use:
Kitchen
Delivery Time:
30 days
SupplyAbility
SupplyAbility:
100000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
Foam, carton, pallet.
OEM is available
Port
shenzhen
Lead Time :
30 days

 

Product Description

RR2920A.jpg

Model Name

RR2920A

Material

Stainless steel  304-18/8

Packing Way

Foam, carton, pallet

MOQ

50 pcs

Port of loading

Shenzhen

Payment tern

T/T, against copy BL. To the other payment term, pls contact us.

Delivery Time

30 days

Specific Use

kitchen

Strength

1. Reasonable price

2. SUS 304 stainless steel material guarantee the water quality.

3. Strong performance of anti bacterium

4. Various styles can customized as customers’ request

 

Contact US
Hot Sale
Certifications

_12.jpg_13.jpg 

Company Information

_08.jpg_09.jpg_10.jpg 

Product Process

_11.jpg 

FAQ

FAQ:

 

1. Q: Are you a factory or trading company? 

A: We are a factory. We produce Sinks and Faucets.

2. Q: Where is your factory located? How can I visit there? 

A: Our factory is located in No.1 Technologic Area Road 3, XingTan Industrial Estate, Xingtan, Shunde District, Foshan City, Guangdong province, China. All our clients, from home or abroad, are warmly welcome to visit us!

3. Q: What is the material of your products?
A: The material is SUS 304 stainless steel
.

4. Q: How can I get some samples?

A: We can accept small order at the first cooperation and make production after you paying for us. Delivery time is 30 days, 30% deposit shuould be paid before shipment, 70% balance should be pay before shipment. You just tell me the port name and our forwarder will ship the goods to your port.   

5. Q: How does your factory do regarding quality control?

A:  "Quality is priority.''Our inspector QC will check the goods in every procedure and modify the parts once they find any problems from them. For our salesman will also check our goods and take photos for every procedure for our client to confirm.

Packaging & Shipping